Scope of Work : Structure, Architecture, Mechanical Electrical, & Plumbing Area Size : ± 6.899 m² Location : Jatibaru, Tanah Abang, Jakarta Pusat Period : September 2019 – May 2024 Back to Portfolio
Scope of Work : Structure, Architecture, & MEP Area Size : ± 8.541 m² Location : Perumahan Royal Residence, Surabaya, Jawa Timur Period : March 2022 – February 2023 Back to Portfolio
Scope of Work : Steel Structure, Architecture, ME, & Plumbing Area Size : ± 1.575 m² Location : Jl. Pali Mura, Tanjung Pandang – Belitung Period : January – September 2020 Back to Portfolio
Scope of Work : Structure, Architecture, & Plumbing Area Size : ± 6.600 m² Location : Jl. Sriwijaya, Kepulauan Belitung Period : April 2017 – May 2018 Back to Portfolio
Scope of Work : Structure, Architecture, & MEP Area Size : ± 8.541 m² Location : Riverside, Jl. A. Yani, Malang Period : December 2019 – January 2021 Back to Portfolio
Scope of Work : Structure & Architecture Area Size : ± 6.000 m² Location : Kelapa Gading, Jakarta Timur Period : October – November 2010 Back to Portfolio